Creating first-class products
/ EN
Current location: Index » Company News

The first public announcement of the environmental impact assessment for the second phase construction project of Jiangxi 863 Industrial Co., Ltd.'s waste catalyst and inert medium regeneration

Hits: 1 Time: 2021-06-03

According to the Environmental Impact Assessment Law of the People's Republic of China and the relevant provisions of the "Public Participation Measures for Environmental Impact Assessment" issued by the Ministry of Ecology and Environment on July 16, 2018 (Order No. 4 of the Ministry of Ecology and Environment), construction projects should conduct public participation during the environmental impact assessment in accordance with the principles of "legality, orderliness, openness, and convenience". The first public announcement of the environmental impact assessment work for the Phase II construction project of Baliusan Industria Co.,td.'s waste catalyst and inert medium regeneration is hereby made.

1、 Construction Project Overview

(1) Project Name: Baliusan Industria Co.,td. Waste Catalyst and Inert Medium Regeneration Phase II Construction Project

(2) Construction Unit: Baliusan Industria Co.,td

(3) Construction location: Jinguang Avenue, Industrial Park, Anyuan District, Pingxiang City, Jiangxi Province

(4) Construction nature: renovation and expansion

(5) Construction content: Baliusan Industria Co.,td. plans to expand a waste catalyst and waste inert medium regeneration unit within the original factory site, to process and regenerate waste catalysts and waste inert media. After the completion of the project, the recycling capacity of waste catalyst will reach 10000 tons per year, and the recycling capacity of waste inert medium will reach 5000 tons per year.

The original project set up exhaust equipment to collect and treat volatile hydrocarbon substances in the hazardous waste temporary storage room through an activated carbon adsorption tower, and discharge them through an exhaust pipe. Fine particulate dust will enter the negative pressure system dust collection system, and the dust generated by the vibrating screen will be drawn by the induced draft device to the bag filter for treatment and discharged through the exhaust pipe. The exhaust gas from the belt kiln is led to the exhaust gas treatment system (dust removal, carbon monoxide (VOC) removal, denitrification) through a fan, and discharged through the exhaust pipe. During the operation period, the emission of waste gas from the conveyor belt kiln shall comply with the emission limit requirements in the "Emission Standards for Air Pollutants from Industrial Kilns" (GB9078-1996), "Emission Standards for Pollutants from Petroleum Refining Industry" (GB31570-2015), and "Pollution Control Standards for Hazardous Waste Incineration" (GB18484-2001). Waste plastic bags, impurities from primary screening, dust collected from primary screening dust collectors, and waste activated carbon are entrusted to units with hazardous waste treatment qualifications for processing. The fine materials from secondary screening and the dust collected by the secondary screening dust collector are temporarily stored in iron drums with built-in plastic bags and sent to the reforming oil refining catalyst production line for comprehensive utilization as raw materials


2、 Name and contact information of the construction unit

Construction Unit:Baliusan Industria Co.,td

Contact: Mr. Zhang

Contact phone number: 13918127464

3、 Name and contact information of the environmental impact assessment agency responsible for the assessment work

Environmental Impact Assessment Unit: Jiangxi Qinghe Blue Environmental Protection Technology Co., Ltd

Contact: Mr. Wang

Contact phone number: 15970606564

4、 The working procedures and main contents of environmental impact assessment

1. The working procedure of environmental impact assessment

(1) The environmental impact assessment agency accepts the commission of the construction unit; (2) Environmental impact assessment agencies conduct on-site exploration and data collection for construction projects; (3) Write an environmental impact assessment report and draw conclusions on the environmental impact assessment; (4) Submission and review of environmental impact assessment report; (5) Environmental impact assessment report for approval.

2. The main work content of environmental impact assessment

Overview and analysis of the construction project, natural and social environment of the project location, environmental quality status, environmental impact analysis, and analysis of environmental impact prevention and control measures.

5、 The network link for the public opinion form is:

http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html

6、 The main ways for the public to express their opinions

During the process of preparing the draft environmental impact assessment report for soliciting opinions, the public can provide comments related to the environmental impact assessment to the construction unit. The public can download the public opinion survey form from the above link and fill it out. When the public expresses their opinions, please provide detailed contact information as much as possible so that we can provide timely feedback on relevant information.


Baliusan Industria Co.,td

June 3, 2021